Sign In | Join Free | My entremaqueros.com |
|
Brand Name : CANGZHOU FMS
Model Number : Shutter Door channel
Certification : ISO CE
Place of Origin : CHINA MAINLAND
MOQ : 1 Set
Price : Negotiable
Payment Terms : L/C, T/T, D/A, D/P
Supply Ability : 20 Sets Per Month
Delivery Time : 30 Working Days
Packaging Details : 20' FLC
Product Name : Panel Door Making Machine Rolling Shutter Slats Roller Forming Machine
Speed : 15m/Min
Voltage : 380V 50Hz 3Phases Or Customerization
Material of Cutting : 45# Forged Steel Plated with Hard Chrom
Core Components : Motor, Bearing, Gear, Pump, PLC
Power : 3KW/5.5KW
Control system : PLC
Weight : 1500 kg
Metal Frame C Purlin Channel Cold Rolling Making Machine
Roller shutter door channel roll forming machine is used for producing shutter door side channel ,which will be used together with guide rail and bottom rail .the Raw material for shutter door machine is galvanized coil or pre painted steel coil ,coil thickness is 0.8-1.2mm ,for this type machine have been sent to many countries such as Singapore,Oman ,Pakistan ,Dominica etc
Slat shutter door U channel machine is the most common style ,it is used fro making flat shutter door panels ,simple but strong and cost effective ,many custoners choose this style
Specification
No | Item | Specification | ||
| Raw material | GI or PPGI | ||
Material thickness | 0.8-1.2MM | |||
| Roller material | Cr12 quenched | ||
Shaft material | High grade 45# steel with Cr12 quenched | |||
Shaft diameter | 50mm | |||
Roller stations | 15 | |||
Middle plate thickness | 16mm | |||
Machine size | 5*0.8*1.2m | |||
Productivity | 8-15m/min | |||
| Material | GCR12 | ||
Method | Hydraulic cutting | |||
| Driving way | Chain 1.2 inch | ||
Motor | 4KW | |||
Hydraulic oil pump | 3KW | |||
Voltage | 380V,50HZ ,3 phase or customized as your need |
Guarantee
In correct operation and maintenance, the machines are 12 months quality guarantee from time of loading, life guarantee repair; within quality guarantee period, except for failures caused by human error, spare parts will be provided freely; after the quality guarantee period, only charge the cost of the spare parts. Free technical supporting and maintenance consulting in lifetime.
Payment terms
35 % in advance as down payment
65 % is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 30 days after the down payment is received.
![]() |
0.8mm Ppgi Cold Roll Forming Machine Metal Frame U Channel Purlin Making Images |